Prefabricated Data Centre Module
Advanced Power Technology is proud to design, deliver and commission a highly efficient prefabricated data centre module for a Northern NHS Trust.
This solution was built off site and craned into position ready for the transfer of critical IT equipment from an existing facility. This is a fantastic example of how smart engineering and design can reduce operating costs and cut carbon emissions while also increasing resilience. This prefab installation has reduced power consumption by around 48% when compared to the existing facility.
It is both worrying and exciting that by 2025, roughly 1/5th of the worlds electrical energy will be consumed by data centres. It’s a worry because our industry is historically focused on resilience. Efficiency concerns quite often take a backseat. On the flip side, companies like Advanced Power have a genuine opportunity to make positive steps towards delivering products that increase both resilience and deliver class leading energy efficiency.