CASE STUDY
Sheffield Hallam boosts IT efficiency with new Schneider Electric data centre designed and installed by APT
Work alongside Balfour Beatty and SHU to implement a highly efficient state-of-the-art data centre in Sheffield Hallam’s new Charles Street facilities.
Following a contract tender, APT was selected to provide and install the cooling and power infrastructure equipment and the DCIM software necessary to manage it efficiently. APT had to work to install highly delicate and critical infrastructure as the building was being constructed.
Two Schneider Electric Hot Aisle Containment Systems (HACS) were deployed to ensure an efficient and effective cooling supply. Two 300kW free-cooling units supply chilled water to the APC InRow cooling units maintain optimum operating temperatures.
APT implemented the latest products from Schneider Electric and other partners to allow the University to operates its IT infrastructure in confidence, knowing that their facilities are not only resilient, but also energy efficient.
Let Advanced Power Technology create the perfect environment for your IT equipment